
Common
Problems:
- Lack of cross-ventilation.
- Insufficient ventilation openings in surrounding walls.
- Inadequate clearance between earth and wood components.
- Water entry into Crawlspace.
- Lack of code-required access to Crawlspace.
- Exterior grade slopes toward the building.
Resultant Damage:
- Mildew, mold and high ambient moisture due to lack of
ventilation.
- Wood rot and structural damage.
- Ponding against building.
- Water through foundation wall.
- Water in Crawlspace.
Proper Design:
- Provide proper clearances between earth and wood components
per the Uniform Building Code (UBC), Chapter 25.
- Provide adequate ventilation openings per UBC, Chapter
25.
- Slope grade away from building.
- Provide cross ventilation per UBC, Chapter 25.
- Provide Crawlspace access per UBC, Chapter 25.
Information provided by Building Analysts, a full-service architectural and engineering firm with many years of experience in construction litigation. Their services include: architectural and structural investigations, repair recommendations, preparation of exhibits and expert testimony. Contact Building Analysts at (619) 234-8153.
© Copyright 2008 The Miller Law Firm. All rights Reserved.
If you experience problems or have questions, contact us at Info@ConstructionDefects.com.
|