CONSTRUCTION DEFECTS



WHAT IS A HOLD DOWN?

Spring 1997

Common Problems:
  • Missing hold down.
  • Undersized holddown.
  • Improper location of hold down.
  • Improper installation of hold down.




Potential Damage:
  • Cracked finishes.
  • Water intrusion.
  • Ruptured plumbing and gas lines.
  • Partial or total collapse of the framing system.
  • Personal Injury
Proper Construction:
  • There are generally two types of hold downs; the embedded strap and the anchor bolt hold down. There function is to prevent the end of a shear wall from lifting off the foundation. The following are the principal elements necessary for hold downs to function properly:
    1. Correct size of anchor bolt and/or hold down.
    2. Attached to the end stud by sufficient nailing or bolting.
    3. Nut tightened sufficiently on anchor bolt
    4. Bolt holes drilled to proper size
    5. Strap or bolt properly imbedded into foundation.
  • Positioned properly at the end of the wall, adjacent to the end post.
  • Positioned at the proper distance from the edge of the foundation.
Typical Hold Downs:

Information provided by Building Analysts, a full-service architectural and engineering firm with many years of experience in construction litigation. Their services include: architectural and structural investigations, repair recommendations, preparation of exhibits and expert testimony. Contact Building Analysts at (619) 234-8153.

Contact The Miller Law Firm

[ASPHALT] [BALCONY/DECK FAILURE] [CRAWLSPACES] [FIREPLACES] [FLOORS/CEILING FAILURE]
[NOISE INTRUSION] [ROOF LEAKS] [TILE ROOF LEAKS] [FLAT ROOF LEAKS] [SHOWER INSTALLATION FAILURE]
[SOIL SUBSIDENCE] [SHEAR WALLS] [BELOW GRADE WALLS] [RETAINING WALLS] [HOLD DOWNS] [WINDOWS]
[WINDOW FLASHING FAILURE] [SLIDING GLASS DOORS] [WOOD ROT]

© Copyright 2001 The Miller Law Firm All rights Reserved.
If you experience problems or have questions, contact us at Info@ConstructionDefects.com.